Market Vacuum

Infrastructure Syndicate

A distributed compute power plant. We can deliver thermodynamic efficiency across residential, industrial, and agricultural environments.

The Missing Middle

Filling the gap between hyperscale training clusters and consumer workstations with enterprise-grade inference nodes.

Hyperscale
Training Clusters

H100/B200 Clusters (AWS, Azure)

Overkill Spec
The Opportunity
Inference Nodes

Clustered RTX 6000s

70% Cost Reduction
Enterprise Bandwidth
Massive RAG Capabilities
Consumer
Gaming / Hobby

Single GPU Workstations

Insufficient VRAM

Geographic Alpha

Optimizing deployments across real estate tiers for heat dissipation and reclaimed energy.

RATES < $0.13/kWh

Energy Arbitrage

Leveraging Ohio's deregulated energy market to access surplus residential capacity at rates 40% below coastal commercial averages.

NEMA 14-50 Standardized Feed
Zero Industrial Overhead
PUE ~ 1.05

Atmospheric Economization

Utilizing the Midwest's 7-month sub-60°F ambient window. We replace active compressor cooling with high-velocity negative pressure containment.

Passive Thermal Exchange
Waste Heat Recapture Ready
384GB VRAM/NODE

Distributed Mesh

Decoupling high-performance inference from the datacenter. Our "Micro-Cell" topology delivers enterprise-grade bandwidth at the network edge.

Llama-3-70B Unquantized
Latency-Optimized Routing

Target Segments

Optimized compute solutions for inference workloads across diverse deployment environments.

Mid-Market Inference

AI Startups & Researchers

Pain Point

Graduated from hobbyist cards, can't afford enterprise contracts.

Solution

96GB VRAM instances optimized for inference workloads with enterprise-grade reliability.

Sovereign Industry

Local Engineering & Defense Firms

Pain Point

IP/ITAR exposure blocks public cloud usage.

Solution

Dedicated nodes with data sovereignty at retainer rates.

Cryptographic Scavenging

Memory-Hard Blockchain Networks

Pain Point

Need high-VRAM for AI-based crypto projects.

Solution

Idle-cycle 'Revenue Floor' covers electricity costs.

Strategic Phasing

A capital-efficient path from leased infrastructure to owned assets.

Months 1-4
Phase 1: Residential Incubation

Deploy first 4 units (16 GPUs) in residential 'garage scale' to validate revenue and maximize margins.

Months 5-8
Phase 2: Commercial Migration

Migrate to industrial flex space with 240V infrastructure. Scale to 10 Seed Rigs (40 GPUs).