Background 1
Background 2
Background 3
Background 4
Background 5
Sovereign AI Compute + Industrial Real Estate

HPC AS AN ASSET CLASS

We build high-density GPU infrastructure in the American Midwest. Transforming industrial power into sovereign intelligence at 70% lower cost than hyperscalers.

View Investor Brief

Infrastructure Projects

Commercial HPC facility and future residential expansion sites, each designed for maximum compute density and revenue generation.

View All Properties

PLAN THE WORK

Commercial Infrastructure

Industrial-scale HPC deployment in Austintown, leveraging 3-phase power and economizer cooling for maximum density.

GPU Cluster Architecture

14 proprietary Seed Rigs with 112 RTX 5090 GPUs, targeting the AI inference gap between hyperscale and consumer.

Industrial Power Advantage

72kW+ capacity on 3-phase service, 4x the capacity of residential deployment at Ohio's industrial power rates.

WORK THE PLAN

Fleet Management

Automated monitoring and optimization across 14 Seed Rigs for maximum uptime and Vast.ai verification.

Revenue Optimization

Tri-modal strategy: Public cloud (Vast.ai), Private local contracts (Ohio SMEs), and mining floor revenue.

Reinvestment Strategy

50% profit allocation to Real Estate Fund, enabling "Earn the House" expansion without external capital.

Roadmap

Execution Timeline

Commercial Acceleration Protocol: $500k seed capital deploying 14 Seed Rigs in leased facility (Months 2-5), then building purpose-built facility for asset ownership (Months 24-36).

Phase 1: Seed ($30k)

Residential Pilot

Initial GPU cluster deployment for revenue validation

Week 1-2

Infrastructure Setup

240V circuit, network fiber installation

Week 2-3

Hardware Procurement

8x RTX 5090, EPYC platform, server PSUs acquisition

Week 3-4

Build & Verification

Assembly, Proxmox install, Vast.ai verification

Phase 2: Commercial HQ ($371k)

Commercial Acceleration

Industrial-scale deployment in leased Austintown facility

Month 1

Foundation

Lease signing, insurance, PDUs, exhaust, 2Gbps fiber

Months 2-3

The Ramp

B2B distributor accounts, 4 rigs/month deployment

Months 4-5

Full Capacity

14 rigs (112 GPUs) deployed, $36,400/mo revenue

Phase 3: Unlisted HQ

Asset Ownership

Purpose-built facility — Move from commercial lease to owned asset

Months 6-24

Capital Accumulation

Profit allocation builds reserves for facility acquisition/construction

Months 24-30

Site Selection & Design

Property acquisition, architectural design, permits for purpose-built facility

Months 30-36

Construction & Migration

Build purpose-built compute facility, migrate operations from leased space

Partner with Unlisted Group

Whether you're an investor, compute customer, or local business seeking AI infrastructure, we're building Ohio's premier private intelligence utility.

Read Documentation

Developer Access

Direct access to the developer for technical inquiries.